While Federal agencies are required to prepare Environmental Impact Statements in accordance with 40 CFR Part 1502, and to file the EISs with the EPA as specified in 40 CFR 1506.9, the EPA doesn’t yet provide a central repository for filing and viewing EISs electronically. Instead, each week they prepare a digest of the preceding week’s filed EISs, which is published every Friday in the Federal Register under the title, “Notice of Availability” (NOA).

We’ve done the dirty work for you. Below, we’ve located and linked to the EISs referenced in last week’s NOA. Please note that some of these documents can be very large, and may take a while to load.

You can read any available EPA comments on these EISs here.

Starting October 1, 2012, EPA no longer accepts paper copies or CDs of EISs for filing purposes. All submissions on or after October 1, 2012 must be made through e-NEPA. Electronic submission does not change requirements for distribution of EISs for public review and comment. To begin using e-NEPA, you must first register with EPA’s electronic reporting site. An EPA source says that as EISs begin to come in electronically, they will appear alongside EPA comments here.

 

* * *

EIS No. 20140171, Draft EIS, WAPA, NE, Interconnection of the Grande Prairie Wind Farm, Comment Period Ends: 08/04/2014, Contact: Rod O’Sullivan 720-962-7260. Website.

EIS No. 20140172, Draft EIS, USACE, OR, Double-crested Cormorant Management Plan to Reduce Predation of Juvenile Salmonids in the Columbia River Estuary, Comment Period Ends: 08/04/2014, Contact: Sondra Ruckwardt 503-808-4510. Website.

EIS No. 20140173, Final EIS, USFS, OR, Wolf Fuels and Vegetation Management Project, Review Period Ends: 07/28/2014, Contact: Jeff Marszal 541-416-6436. Website.

EIS No. 20140174, Final EIS, USAF, NH, Second Main Operating Base KC-46A Beddown at Alternative Air National Guard Installations, Review Period Ends: 07/21/2014, Contact: Kevin Marek 240-612-8855. Website and website.

EIS No. 20140175, Draft EIS, FERC, TX, Corpus Christi LNG Project, Comment Period Ends: 8/04/2014, Contact: Kandi Barakat 202-502-6365. Website.

EIS No. 20140176, Final EIS (Only Draft EIS currently available.), USACE, LA, Calcasieu Lock, Louisiana Feasibility Study, Review Period Ends: 07/21/2014, Contact: Timothy K. George 314-331-8459. Website.

 

AMENDED NOTICE:

EIS No. 20140167, Final EIS, USACE, HI, Honolulu Seawater Air Conditioning Project, Review Period Ends: 07/28/2014, Contact: Ryan Winn 808-835-4309. Revision to the FR Notice Published 6/13/2014; Correct Review Period from 7/14/2014 to 07/28/214

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: