Last Week in Environmental Impact Statements: Remote Vaccination Program

While Federal agencies are required to prepare Environmental Impact Statements in accordance with 40 CFR Part 1502, and to file the EISs with the EPA as specified in 40 CFR 1506.9, the EPA doesn’t yet provide a central repository for filing and viewing EISs electronically. Instead, each week they prepare a digest of the preceding week’s filed EISs, which is published every Friday in the Federal Register under the title, “Notice of Availability” (NOA).

We’ve done the dirty work for you. Below, we’ve located and linked to the EISs referenced in last week’s NOA. Please note that some of these documents can be very large, and may take a while to load.

You can read any available EPA comments on these EISs here.

Starting October 1, 2012, EPA no longer accepts paper copies or CDs of EISs for filing purposes. All submissions on or after October 1, 2012 must be made through e-NEPA. Electronic submission does not change requirements for distribution of EISs for public review and comment. To begin using e-NEPA, you must first register with EPA’s electronic reporting site. An EPA source says that as EISs begin to come in electronically, they will appear alongside EPA comments here.

* * *

EIS No. 20140012, Draft EIS, HHS, GA, Centers for Disease Control and Prevention Roybal Campus 2015–2025 Master Plan, Comment Period Ends: 03/10/2014, Contact: George Chandler 404–245–2763. Website.

EIS No. 20140013, Third Final Supplement (This supplement does not appear to be online yet), USACE, NM, Rio Grande Floodway, San Acacia to Bosque del Apache Unit, Review Period Ends: 02/24/2014, Contact: Jerry Nieto 505–342–3362.Website and website.

EIS No. 20140014, Second Draft EIS (Tiering) (Not yet available online), FHWA, IL, Illiana Corridor Project Tier Two Transportation System Improvements, Comment Period Ends: 03/10/2014, Contact: Catherine A. Batey 217–492–4600. Website.

EIS No. 20140015, Final EIS, NPS, WY, Remote Vaccination Program to Reduce the Prevalence of Brucellosis in Yellowstone Bison, Review Period Ends: 02/24/2014, Contact: Jennifer Carpenter 307–344–2528. Website.

EIS No. 20140016, Draft EIS, USFWS, OH, Ballville Dam Project, Comment Period Ends: 03/26/2014, Contact: Brian Elkington 612–713–5168. Website.

EIS No. 20140017, Final EIS (Not yet available online – check back here for updates.), USMC, CA, LEGISLATIVE—Renewal of the Chocolate Mountain Aerial Gunnery Range Land Withdrawal, Review Period Ends: 02/24/2014, Contact: Ms. Kelly Finn 619–532–4452. Website.

EIS No. 20140018, Draft EIS, USN, WA, Northwest Training and Testing, Comment Period Ends: 03/25/2014, Contact: John Mosher 360–257–3234. Website.

2 responses to this post.

  1. Thanks for the tip, Lorna! I’ll update the listing.

    Reply

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: