Last Week in Environmental Impact Statements: Berryessa Creek Element Coyote

While Federal agencies are required to prepare Environmental Impact Statements in accordance with 40 CFR Part 1502, and to file the EISs with the EPA as specified in 40 CFR 1506.9, the EPA doesn’t yet provide a central repository for filing and viewing EISs electronically. Instead, each week they prepare a digest of the preceding week’s filed EISs, which is published every Friday in the Federal Register under the title, “Notice of Availability” (NOA).

We’ve done the dirty work for you. Below, we’ve located and linked to the EISs referenced in last week’s NOA. Please note that some of these documents can be very large, and may take a while to load.

You can read any available EPA comments on these EISs here.

Starting October 1, 2012, EPA no longer accepts paper copies or CDs of EISs for filing purposes. All submissions on or after October 1, 2012 must be made through e-NEPA. Electronic submission does not change requirements for distribution of EISs for public review and comment. To begin using e-NEPA, you must first register with EPA’s electronic reporting site. An EPA source says that as EISs begin to come in electronically, they will appear alongside EPA comments here.

* * *

EIS No. 20130381, Draft EIS, FHWA, TX, US 181 Harbor Bridge Project, Comment Period Ends: 03/03/2014, Contact: Gregory Punske 512–536–5960. Website.

EIS No. 20130382, Draft EIS, NPS, 00, Glen Canyon National Recreation Area Off-road Vehicle Management Plan, Comment Period Ends: 03/04/2014, Contact: Brian Carey 928–608–6209. Website.

EIS No. 20130383, Final EIS, USACE, CA, Berryessa Creek Element Coyote and Berryessa Creek California Flood Control Project, Review Period Ends: 02/03/2014, Contact: Tyler Stalker 916–557–5107. Website.

 

Amended Notices

EIS No. 20130325, Draft EIS, NPS, MO, Ozark National Scenic Riverways Draft General Management Plan, Wilderness Study, Comment Period Ends: 02/07/2014, Contact: William Black 573–323–4236, Revision to the FR Notice Published 12/06/2013; Extending Comment Period from 01/08/2014 to 02/07/2014. Website.

EIS No. 20130360, Final EIS, USFS, AZ, Rosemont Copper Project, Proposed Construction, Operation with Concurrent Reclamation and Closure of an Open-Pit Copper Mine, Review Period Ends: 02/14/2014, Contact: Mindy Vogel 520–388–8300, Revision to FR Notice Published 12/20/2013; Correcting the Review Period End Date to read 02/14/2014. Website.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: