Last Week in Online Environmental Impact Statements: Waste Confidence

While Federal agencies are required to prepare Environmental Impact Statements in accordance with 40 CFR Part 1502, and to file the EISs with the EPA as specified in 40 CFR 1506.9, the EPA doesn’t yet provide a central repository for filing and viewing EISs electronically. Instead, each week they prepare a digest of the preceding week’s filed EISs, which is published every Friday in the Federal Register under the title, “Notice of Availability” (NOA). However, starting October 1, 2012 all EIS submissions must be made through e-NEPA. An EPA source says that as EISs begin to come in electronically, they will appear alongside EPA comments here.

In the meantime, we’ve done the dirty work for you. Below, we’ve located and linked to the EISs referenced in last week’s NOA. Please note that some of these documents can be very large, and may take a while to load.

You can read any available EPA comments on these EISs here.

* * *

EIS No. 20130263, Draft EIS, FHWA, NV, Pyramid Highway/US 395 Connection, Comment Period Ends: 11/12/2013, Contact: Abdelmoez Abdalla 775–687–1231. Website.

EIS No. 20130264, Final EIS, FHWA, CO, Interstate 25 Improvements through Pueblo, Review Period Ends: 10/15/2013, Contact: Chris Horn 720–963–3017. Website.

EIS No. 20130265, Final EIS, USFS, UT, Fishlake National Forest Oil and Gas Leasing Analysis Project, Review Period Ends: 10/21/2013, Contact: Rob Hamilton 435–896–1022. Website.

EIS No. 20130266, Draft EIS, USN, GU, The Mariana Islands Training and Testing, Comment Period Ends: 11/12/2013, Contact: John Van Name 808–471–1714. Website.

EIS No. 20130267, Final Supplement, USFS, CA, Sierra Nevada Forest Plan Amendment (SNFPA), Review Period Ends: 11/18/2013, Contact: Donald Yasuda 916–640–1168. Website.

EIS No. 20130268, Final EIS, USFWS, WV, Proposed Issuance of an Incidental Take Permit For the Beech Ridge Energy Wind Project Habitat Conservation Plan, Review Period Ends: 10/15/2013, Contact: Laura Hill 304–636–6586. Website.

EIS No. 20130269, Draft EIS, NRC, 00, Generic—Waste Confidence, Comment Period Ends: 11/27/2013, Contact: Sarah Lopas 301–287–0675. Website.

EIS No. 20130270, Draft EIS, FHWA, OH, Cleveland Opportunity Corridor Project, Comment Period Ends: 10/28/2013, Contact: Naureen Dar 614–280–6846. Website.

EIS No. 20130271, Final EIS, HUD, NY, Halletts Point Rezoning, Review Period Ends: 10/15/2013, Contact: Robert Dobruskin 212–720–3423. Website.

EIS No. 20130272, Final EIS, USFS, AK, Greens Creek Mine Tailings Disposal Facility Expansion, Review Period Ends: 10/28/2013, Contact: Sarah Samuelson 907–789–6274. Website.

 

Amended Notices

EIS No. 20130159, Final Supplement, USACE, IN, Indianapolis North Flood Damage Reduction Project, Review Period Ends: 10/31/2013, Contact: Keith Keeney 502–315–6885 Revision to FR Notice Published 07/05/2013; Extending Comment Period from 09/06/2013 to 10/31/2013. Website.

EIS No. 20130260, Draft EIS, BIA, NV, Moapa Solar Energy Center, Comment Period Ends: 10/21/2013, Contact: Amy Heuslein 602–379–6750. Revision to FR Notice Published 09/06/2013; Correction to Comment Period—Change from 10/14/2013 to 10/21/2013 and Contact Phone Number should be 602–379–6750. Website.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: