Last Week in Online Environmental Impact Statements: Sounding Rockets Program at Poker Flat

While Federal agencies are required to prepare Environmental Impact Statements in accordance with 40 CFR Part 1502, and to file the EISs with the EPA as specified in 40 CFR 1506.9, the EPA doesn’t yet provide a central repository for filing and viewing EISs electronically. Instead, each week they prepare a digest of the preceding week’s filed EISs, which is published every Friday in the Federal Register under the title, “Notice of Availability” (NOA). However, starting October 1, 2012 all EIS submissions must be made through e-NEPA. An EPA source says that as EISs begin to come in electronically, they will appear alongside EPA comments here.

In the meantime, we’ve done the dirty work for you. Below, we’ve located and linked to the EISs referenced in last week’s NOA. Please note that some of these documents can be very large, and may take a while to load.

You can read any available EPA comments on these EISs here.

* * *

EIS No. 20130199, Draft Supplement, BLM, WY, Bighorn Basin Draft Resource Management Plan Revision Project, Comment Period Ends: 10/12/2013, Contact: Caleb Hiner 307–347–5100. Website.

EIS No. 20130200, Final EIS, FTA, CA, Van Ness Bus Rapid Transit Project, Review Period Ends: 08/12/2013, Contact: Alex Smit 415–744–3133. Website.

EIS No. 20130201, Final EIS, USFS, AK, Big Thorne Project, Review Period Ends: 08/12/2013, Contact: Frank Roberts 907–828–3250. Website.

EIS No. 20130202, Draft EIS, NOAA, 00, Amending the Atlantic Large Whale Take Reduction Plan, Vertical Line Rule, Comment Period Ends: 09/13/2013, Contact: Kate Swails 978–282–8481. Website.

EIS No. 20130203, Final Supplement, USFS, CA, Eldorado National Forest Travel Management, Review Period Ends: 08/12/2013, Contact: Diana Erickson 530–621–5214. Website.

EIS No. 20130204, Final EIS, NASA, AK, Sounding Rockets Program at Poker Flat Research Range, Review Period Ends: 08/12/2013, Contact: Joshua A. Bundick 757–824–2319. Website.

EIS No. 20130205, Final EIS (Only DEIS available online at this time. Check back here for updates.), FHWA, CA, State Route 58 (SR–58) Hinkley Expressway Project, Review Period Ends: 08/12/2013, Contact: James Shankel 909–383–6379. Website.

EIS No. 20130206, Revised Final EIS, USACE, FL, Addendum to the Final Areawide EIS on Phosphate Mining in the Central Florida Phosphate District, Review Period Ends: 08/12/2013, Contact: John Fellows 813–769–7070. Website.

EIS No. 20130207, Draft EIS, FHWA, DC, Virginia Avenue Tunnel Reconstruction, Comment Period Ends: 08/26/2013, Contact: Michael Hicks 202–219–3513. Website.

 

Amended Notice

EIS No. 20130148, Draft Supplement, USACE, FL, Jacksonville Harbor Navigation, Comment Period Ends: 07/31/2013, Contact: Paul Stodola 904–232–3271. Revision to FR Notice Published 06/07/2013; Extending Comment Period from 07/15/2013 to 07/31/2013. Website.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: