This Week in Online Environmental Impact Statements: Feather River and Thunder Bay

While Federal agencies are required to prepare Environmental Impact Statements in accordance with 40 CFR Part 1502, and to file the EISs with the EPA as specified in 40 CFR 1506.9, the EPA doesn’t yet provide a central repository for filing and viewing EISs electronically. Instead, each week they prepare a digest of the preceding week’s filed EISs, which is published every Friday in the Federal Register under the title, “Notice of Availability” (NOA). However, starting October 1, 2012 all EIS submissions must be made through e-NEPA. An EPA source says that as EISs begin to come in electronically, they will appear alongside EPA comments here.

In the meantime, we’ve done the dirty work for you. Below, we’ve located and linked to the EISs referenced in last week’s NOA. Please note that some of these documents can be very large, and may take a while to load.

You can read any available EPA comments on these EISs here.

* * *

EIS No. 20130160, Final EIS, USFS, OR, McKay Fuels and Vegetation Management Project, Review Period Ends: 07/15/2013, Contact: Marcy Anderson 541-416-6463. Website.

EIS No. 20130161, Draft EIS, USFS, MT, East Reservoir Project, Comment Period Ends: 07/29/2013, Contact: Denise Beck 406-293-7773, ext. 7504. Website.

EIS No. 20130162, Final EIS, BLM, NM, SunZia Southwest Transmission Project, Proposed Resource Management Plan Amendments, Review Period Ends: 07/15/2013, Contact: Adrian Garcia 505-954-2199. Website.

EIS No. 20130163, Draft EIS, FERC, AL, Martin Dam Hydroelectric Project, Relicensing, Comment Period Ends: 08/13/2013, Contact: Stephen Bowler 202-502-6861. Website.

EIS No. 20130164, Revised Draft EIS, USAF, FL, F-35 Beddown at Eglin Air Force Base, Comment Period Ends: 07/29/2013, Contact: Mike Spaits 850-882-2836. (Check back here for updates.)

EIS No. 20130165, Draft EIS, BLM, SD, South Dakota Resource Management Plan, Comment Period Ends: 09/11/2013, Contact: Mitch Iverson 605-892-7008. Website.

EIS No. 20130166, Final EIS, USFWS, NiSource Multi-Species Habitat Conservation Plan, Review Period Ends: 07/15/2013, Contact: Thomas J. Magnuson 612-713-5467. Website.

EIS No. 20130167, Draft EIS, NOAA, MI, Thunder Bay National Marine Sanctuary, Boundary Expansion, Comment Period Ends: 08/14/2013, Contact: Jeff Gray 989-356-8805. Website.

EIS No. 20130168, Final EIS, USACE, CA, Feather River West Levee Project Final 408 Permission, Review Period Ends: 07/15/2013, Contact: Jeffery Koschak 916-557-6994. Website.

EIS No. 20130169, Final Supplement, NRC, TN, Operation of Watts Bar Nuclear Plant, Unit 2 NUREG-0498, Supplement 2, Review Period Ends: 07/15/2013, Contact: Elaine Keegan 301-415-8517. Website.

EIS No. 20130170, Draft Supplement (Appendices), USACE, CA, Sutter Basin Pilot Draft Feasibility Study, Comment Period Ends: 07/29/2013, Contact:  Brad Johnson 916-557-7812. Website.

 

AMENDED NOTICES

EIS No. 20130159, Final Supplement, USACE, IN, Indianapolis North Flood Damage Reduction Project, Review Period Ends: 07/08/2013, Contact: Keith Keeney 502-315-6885. Revision to FR Notice Published 06/07/2013; Change Agency Contact and Phone Number to Keith Keeney (502) 315-6885. Website.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: