Last Week in Environmental Impact Statements: All Other Bird Hazard Management Activities

Photo by mikebaird. Some rights reserved.

While Federal agencies are required to prepare Environmental Impact Statements in accordance with 40 CFR Part 1502, and to file the EISs with the EPA as specified in 40 CFR 1506.9, the EPA doesn’t yet provide a central repository for filing and viewing EISs electronically. Instead, each week they prepare a digest of the preceding week’s filed EISs, which is published every Friday in the Federal Register under the title, “Notice of Availability” (NOA).

We’ve done the dirty work for you. Below, we’ve located and linked to the EISs referenced in last week’s NOA. Please note that some of these documents can be very large, and may take a while to load.

You can read any available EPA comments on these EISs here.

The EPA is still looking for agencies willing to participate in a new pilot program for electronic submission of EIS filings. To participate in the pilot, agencies should register at: https://cdx.epa.gov

* * *

EIS No. 20120136, Final Supplement, APHIS, NY, Bird Hazard Reduction Program, John F. Kennedy International Airport, Updated Information on the Efficacy and Impacts of the Gull Hazard Reduction Program and All Other Bird Hazard Management Activities, Queens County, NY, Review Period Ends: 06/13/2012, Contact: Martin S. Lowney 518-477-4837. Website.

EIS No. 20120137, Draft EIS, USFS, 00, Mountain Pine Beetle Response Project, Implementing Multiple Resource Management Activities, Black Hills National Forest, Custer, Fall River, Lawrence, Meade, and Pennington Counties, SD and Crook and Weston Counties, WY, Comment Period Ends: 06/25/2012, Contact: Katie Van Alstyne 605-343-1567. Website.

EIS No. 20120138, Draft EIS, USACE, FL, Tarmac King Road Limestone Mine, Construction, Issuance of Permit, Levy County, FL, Comment Period Ends: 07/11/2012, Contact: Edward Sarfert 850-439-9533. Website.

EIS No. 20120139, Draft EIS, NPS, GA, Fort Pulaski National Monument General Management Plan and Wilderness Study, Implementation, Chatham County, GA, Comment Period Ends: 07/09/2012, Contact: David Libman 404-507-5701. Website.

EIS No. 20120140, Final EIS, USAF, OH, Wright-Patterson Air Force Base (WPAFB) Project, Reconfigure and Relocate Facilities and Base Perimeter Fence Relocation in Area A, Fairborn, OH, Review Period Ends: 06/11/2012, Contact: Estella Holmes 937-522-3522. Website.

EIS No. 20120141, Final EIS, USFS, CO, Beaver Creek Mountain Improvements Project, Special Use Permit, White River National Forest, Eagle County, CO, Review Period Ends: 06/11/2012, Contact: Don Dressler 970-827-5157. Website.

EIS No. 20120142, Draft EIS, USN, 00, Atlantic Fleet Training and Testing Activities, To Support and Conduct Current, Emerging, and Future Training and Testing Activities along the Eastern Coast of the U.S. and Gulf of Mexico, Comment Period Ends: 06/25/2012, Contact: Jene Nissen 757-836-5221. Website.

EIS No. 20120143, Draft EIS, USN, 00, Hawaii-Southern California Training and Testing Activities, To Support and Conduct Current, Emerging, and Future Training and Testing Activities off Southern California and around the Hawaiian Islands, CA, HI, Comment Period Ends: 06/25/2012, Contact: Alex Stone 619-545-8128. Website.

EIS No. 20120144, Draft EIS, USAF, CA, F-15 Aircraft Conversion, 144th Fighter Wing, California National Guard, To Convert the Unit from the F-16 Fighting Falcon Aircraft and Operations to the F-15 Eagle Aircraft and Operations at Fresno-Yosemite International Airport, Fresno County, CA, Comment Period Ends: 06/25/2012, Contact: Robert Dogan 240-612-8859. Website.

EIS No. 20120145, Draft EIS, BR, CA, Water Transfer Program for the San Joaquin River Exchange Contractors Water Authority, 2014-2038, To Execute Agreements for Water Transfers/or Exchanges, San Joaquin Valley, Fresno, Madera, Merced, and Stanislaus Counties, CA, Comment Period Ends: 07/03/2012, Contact: Bradley Hubbard 916-978-5204. Website.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: