Last Week in Environmental Impact Statements: Black Hills, White Hills

Image by Thomas G. Kristensen. Some rights reserved.

While Federal agencies are required to prepare Environmental Impact Statements in accordance with 40 CFR Part 1502, and to file the EISs with the EPA as specified in 40 CFR 1506.9, the EPA doesn’t yet provide a central repository for filing and viewing EISs electronically. Instead, each week they prepare a digest of the preceding week’s filed EISs, which is published every Friday in the Federal Register under the title, “Notice of Availability” (NOA).

We’ve done the dirty work for you. Below, we’ve located and linked to the EISs referenced in last week’s NOA. Please note that some of these documents can be very large, and may take a while to load.

You can read any available EPA comments on these EISs here.

This week, the EPA slipped in a call to agencies willing to participate in a new pilot program for electronic submission of EIS filings. To participate in the pilot, agencies should register at: https://cdx.epa.gov

* * *

EIS No. 20120113, Final EIS, BPA, OR, Albany-Eugene 115 kilovolt No. 1 Transmission Line Rebuild Project, Extending from Albany Substation to the Alderwood Tap, Linn and Lane Counties OR, Review Period Ends: 05/29/2012, Contact: Douglas F. Corkran, 503–230–7646. Website.

EIS No. 20120114, Final Supplement (Volume 1, Volume 2), USN, CA, Hunters Point (Former) Naval Shipyard Disposal and Reuse, Supplement Information on the 2000 FEIS, Implementation, City of San Francisco, San Francisco County, CA, Review Period Ends: 05/29/2012, Contact: Ronald Bochenek, 619–532–0906. Website.

EIS No. 20120115, Final EIS, USFS, AK, Tonka Timber Sale Project, Proposed Timber Harvesting, Petersburg Ranger District, Tongass National Forest, Petersburg, AK, Review Period Ends: 05/29/2012, Contact: Jason Anderson, 907–772–3871. Website.

EIS No. 20120116, Final EIS (Volume 1, Volume 2), USFS, SD, Vestal Project, Commercial and Noncommercial Vegetation Treatments and Prescribed Burning to Reduce Mountain Pine Beetle Risk and Fire Hazard, Hell Canyon Ranger District, Black Hills National Forest, Custer County, SD, Review Period Ends: 05/29/2012, Contact: Lynn Kolund, 605–673–4853. Website.

EIS No. 20120117, Draft EIS, BLM, WY, Lost Creek In Situ Recovery Project, To Analyze the Site-Specific Impacts Associated with the Plan of Operations, Sweetwater County, WY, Comment Period Ends: 06/11/2012, Contact: John Russell, 307–328–4252. Website.

EIS No. 20120118, Final EIS, FTA, CA, California High-Speed Train (HST): Merced to Fresno Section High-Speed Train, Propose to Construct, Operate, and Maintain an Electric-Powered High-Speed Train (HST), Merced, Madera, and Fresno Counties, CA, Review Period Ends: 05/29/2012, Contact: David Valenstein, 202–493–6381. Website.

EIS No. 20120119, Final EIS, NPS, IN, Indiana Dunes National Lakeshore, White-Tailed Deer Management Plan, Implementation, Lake, Porter, LaPorte Counties, IN, Review Period Ends: 05/29/2012, Contact: Randy Knutson, 219–395–1550. Website.

EIS No. 20120120, Draft EIS, BLM, CO, Mohave County Wind Farm Project, Application for a Right-of-Way Grant to Construct, Operate, Maintain and Decommission a Wind Powered Electrical Generation Facility, White Hills, Mohave County, CO, Comment Period Ends: 06/11/2012, Contact: Jerry Crockford, 505–360–0473. Website.

EIS No. 20120121, Final EIS, FHWA, OR, Newberg Dundee Bypass Project, Proposal to Build a Four Lane Expressway and Reduce Congestion on OR 99W, from OR 99W/OR/8 to the top of Rex Hill, USACE 404/ Removal Fill Permits, Funding, Yamhill and Washington Counties, OR, Review Period Ends: 05/29/2012, Contact: Michelle Eraut, 503–316–2559. Website.

EIS No. 20120122, Draft Supplement, USACE, NM, Rio Grande Floodway Flood Protection Plan, San Acacia to Bosque Del Apache Unit, To Provide Higher Levels of Flood Risk Management to Floodplain Communities from San Acacia Diversion Dam Downstream to Elephant Butte Lake, Socorro County, NM, Comment Period Ends: 06/11/2012, Contact: Julie A. Alcon, 505–342–3281.

EIS No. 20120123, Final EIS, BLM, NV, Phoenix Copper Leach Project, Construction and Operation of a New Copper Beneficiation Facility, Lander County, NV, Review Period Ends: 05/29/2012, Contact: Dave Davis, 775–635–4000. Website.

EIS No. 20120124, Final EIS, NPS, SD, South Unit—Badlands National Park, General Management Plan, Implementation, SD, Review Period Ends: 05/29/2012, Contact: Eric J. Brunnemann, 605–433–5361. Website.

EIS No. 20120125, Final EIS, FTA, CA, Hercules Intermodal Transit Center, Construction To Improve Access to Public Transit, Funding USACE Section 404 Permit, Contra Costa County, CA, Review Period Ends: 05/29/2012, Contact: Paul Page, 415–744–2734. Website.

EIS No. 20120126, Draft EIS, USFS, CO, Black Mesa Vegetation Management Project, Implementation, Divide Ranger District, Rio Grande National Forest, Hinsdale and Mineral Counties, CO, Comment Period Ends: 06/11/2012, Contact: Thomas Malecek, 719–657–3321. Website.

EIS No. 20120127, Final EIS, USFS, CA, Rubicon Trail Easement and Resource Improvement Project, Construction and Operation, Right-of-Way Grant, Eldorado National Forest, Pacific Ranger District, El Dorado County, CA, Review Period Ends: 05/29/2012, Contact: Laura Hierholzer, 530–642–5187. Website.

Amended Notices

EIS No. 20120047, Draft EIS, BIA, WA, West Plains Casino and Mixed-Use Development Project, Approval of Gaming Development and Management, Spokane Tribe of Indians, Spokane County, WA, Comment Period Ends: 05/16/2012, Contact: Dr. B.J. Howerton, 503–231–6749. Revision to FR Notice Published 03/02/2012; Lead Agency Re-opening the Comment Period to end 05/16/2012.

EIS No. 20120104, Draft EIS (Volume 1, Volume 2), NOAA, 00, Amendment 5 to the Atlantic Herring Fishery Management Plan, Implementation, Comment Period Ends: 06/04/2012, Contact: Daniel S. Morris, 978–281–9250. Revision to FR Notice Published 04/20/2012: Change Agency Contact to Daniel S. Morris, 978–281–9250 and Correction to EIS Title.

2 responses to this post.

  1. Posted by kiki on May 15, 2012 at 1:29 pm

    Thank you for this service. FYI, the link for EIS # 20120122 is incorrect. Please revise to :http://www.spa.usace.army.mil/Portals/16/docs/environmental/fonsi/DraftGRRSEISII.pdf

    Reply

  2. Thanks for catching that, Kiki! I’ve updated the link.

    Reply

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: