Last Week in Environmental Impact Statements: To Remediate Seismic, Seepage, and Hydrologic Deficiencies

While Federal agencies are required to prepare Environmental Impact Statements in accordance with 40 CFR Part 1502, and to file the EISs with the EPA as specified in 40 CFR 1506.9, the EPA doesn’t yet provide a central repository for filing and viewing EISs electronically. Instead, each week they prepare a digest of the preceding week’s filed EISs, which is published every Friday in the Federal Register under the title, “Notice of Availability” (NOA).

We’ve done the dirty work for you. Below, we’ve located and linked to the EISs referenced in last week’s NOA. Please note that some of these documents can be very large, and may take a while to load.

You can read any available EPA comments on these EISs here.

* * *

EIS No. 20120069, Final Supplement, USFS, ID, Lakeview-Reeder Fuels Reduction Project, Proposed Fuels Reduction and Road Treatment Activities, Updated and New Information, Idaho Panhandle National Forests, Priest Lake Ranger District, Bonner County, ID, Review Period Ends: 04/23/2012, Contact: A.J. Helgenberg 208–265–6643.

EIS No. 20120070, Draft EIS (scroll down to bottom of page), FHWA, ME, I–395/Route 9 Transportation System, To Improve Transportation System Linkage, Safety, and Mobility, USACE 404 Permit Application, Penobscot and Hancock Counties, ME, Comment Period Ends: 05/15/2012, Contact: Mark Hasselmann 207–622–8350.

EIS No. 20120071, Final EIS, NPS, MD, Hampton National Historic Site, General Management Plan, Implementation, Baltimore County, MD, Review Period Ends: 04/23/2012, Contact: Tina Orcutt 410–962–4290.

EIS No. 20120072, Final EIS (scroll halfway down page), FTA, CA, Westside Subway Extension Transit Corridor Project, Extension of the Existing Metro Purple Line and Metro Red Line Heavy Rail Subway, Los Angeles County Metropolitan Transportation Authority, Los Angeles County, CA, Review Period Ends: 04/23/2012, Contact: Ray Tellis 213–202–3956.

EIS No. 20120073, Draft EIS, USACE, CA, Isabella Lake Dam Safety Modification Project, To Remediate Seismic, Seepage, and Hydrologic Deficiencies in the Main Dam, Spillway and Auxiliary Dam, Kern County, CA, Comment Period Ends: 05/07/2012, Contact: Tyler M. Stalker 916–557–5107.

EIS No. 20120074, Draft EIS, BLM, CA, Calnev Pipeline Expansion Project, Construction, Operation, and Maintenance of a 233-mile Pipeline from North Colton Terminal to Bracken Junction, USACE Section 404 Permit, San Bernardino County, CA, Comment Period Ends: 06/21/2012, Contact: Rich Rotte 760–252–6026.

EIS No. 20120075, Draft EIS, FHWA, IA, Eastern Hills Drive and Connecting Roadways Construction Project, To Improve Transportation Network East of Council Bluff, Funding, USACE Section 404 Permit, Pottawattamie County, IA, Comment Period Ends: 05/07/2012, Contact: Lubin Quinones 515–233–7300.

EIS No. 20120076, Draft EIS, USFS, WI, Park Falls Hardwoods Vegetation and Transportation Management Activities, Implementation, Chequamegon-Nicolet National Forest, Medford-Park Falls Ranger District, Price County, WI, Comment Period Ends: 05/07/2012, Contact: Jane Darnell 715–748–4875 ext. 38.

EIS No. 20120077, Final EIS, FERC, 00, New Jersey-New York Expansion Project, Propose to Modify and Expand Existing Natural Gas Transmission Pipeline Systems in New Jersey, New York, and Connecticut, Review Period Ends: 04/23/2012, Contact: Roberta Coulter 202–502–8584.

EIS No. 20120078, Second Draft Supplement (I believe this is the “Limited Scope Supplemental”), FHWA, TX, Trinity Parkway Project, Construction of a Six-Lane Controlled Access Toll Facility from IH–35 E/TX–183 to US–175/TX–310, Additional Information on the Compatibility with Levee Remediation Plans for the Dallas Floodway and New Information on Historic Resources, US Army COE Section 10 and 404 Permits, Dallas County, TX, Comment Period Ends: 05/07/2012, Contact: Salvador Deocampo 512–536–5950.

EIS No. 20120079, Final Supplement, USFS, MI, Huron-Manistee National Forests, Land and Resource Management Plan, Supplements the 2006 FEIS Analysis and to Correct the Deficiencies that the Meister Panel Identified, Implementation, Several Counties, MI, Review Period Ends: 04/23/2012, Contact: Kenneth Arbogast 231–775–2421.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: