Last Week in Environmental Impact Statements: Mukilteo Multimodal and Managing Motorized and Mechanized Travel

While Federal agencies are required to prepare Environmental Impact Statements in accordance with 40 CFR Part 1502, and to file the EISs with the EPA as specified in 40 CFR 1506.9, the EPA doesn’t yet provide a central repository for filing and viewing EISs electronically. Instead, each week they prepare a digest of the preceding week’s filed EISs, which is published every Friday in the Federal Register under the title, “Notice of Availability” (NOA).

We’ve done the dirty work for you. Below, we’ve located and linked to the EISs referenced in last week’s NOA. Please note that some of these documents can be very large, and may take a while to load.

You can read any available EPA comments on these EISs here.

* * *

EIS No. 20120013, Final EIS (scroll down to “Supporting” documents), USFS, ID, Clearwater National Forest Travel Planning Project, Proposes to Manage Motorized and Mechanized Travel, Clearwater National Forest, Idaho, Clearwater, Latah and Shoshone Counties, ID, Review Period Ends: 02/27/2012, Contact: Heather Berg (208) 476–4541.

EIS No. 20120014, Revised Draft EIS, USFS, MT, East Deer Lodge Valley Landscape Restoration Management Project, To Conduct Landscape Restoration Management Activities, Additional Information Including the Addition of Alternative 3, Pintler Ranger District, Beaverhead Deerlodge National Forest, Powell and Deerlodge Counties, MT, Comment Period Ends: 03/12/2012, Contact: Brent Lignell (406) 494–2147.

EIS No. 20120015, Draft EIS, FTA, WA, Mukilteo Multimodal Project, To Improve the Operations, Safety and Security of Facilities Serving the Mukilteo-Clinton Ferry Route, Funding, USACE Section 10 and 404 Permits, Snohomish County, WA, Comment Period Ends: 03/12/2012, Contact: Daniel Drais (206) 220–4465.

EIS No. 20120016, Draft EIS, BLM, NV, Hycroft Mine Expansion Project, Proposes to Expand Mining Activities on BLM Managed Public Land and Private Land, Approval, Humboldt and Pershing Counties, NV, Comment Period Ends: 03/12/2012, Contact: Kathleen Rehberg (775) 623–1500.

EIS No. 20120017, Draft EIS, FHWA, NY, Tappan Zee Hudson River Crossing Project, To Provide an Improved Hudson River Crossing between Rockland and Westchester Counties Funding, USACE Section 10 and 404 Permits, Rockland and Westchester Counties, NY, Comment Period Ends: 03/15/2012, Contact: Jonathan D. McDade (518) 431–4125.

EIS No. 20120018, Final EIS (Vol. II – Appendices), FHWA, CA, State Route 76 South Mission Road to Interstate 15 Highway Improvement Project, Widening and Realignment Including Interchange Improvements, USACE Section 404 Permit, San Diego County, CA, Review Period Ends: 02/27/2012, Contact: Manuel E. Sanchez (619) 699–7336.

 

Amended Notices

EIS No. 20110350, Draft EIS, USFS, AZ, Rosemont Copper Project, Proposed Construction, Operation with Concurrent Reclamation and Closure of an Open-Pit Copper Mine, Coronado National Forest, Pima County, AZ, Comment Period Ends: 01/31/2012, Contact: Bev Everson (520) 388–8300. Revision to FR Publication 10/21/2011; Extending Comment Period from 1/18/2012 to 1/31/2012.

EIS No. 20110420, Draft Supplement, USACE, TX, Clear Creek Reevaluation Study Project, Flood Risk Management and Ecosystem Restoration, Brazoria, Fort Bend, Galveston and Harris Counties, TX, Comment Period Ends: 01/30/2012, Contact: Andrea Catanzaro (409) 766–6346. Revision to FR Notice Published 12/16/2012; Extending Comment Period from 01/30/2012 to 02/14/2012.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: