While Federal agencies are required to prepare Environmental Impact Statements in accordance with 40 CFR Part 1502, and to file the EISs with the EPA as specified in 40 CFR 1506.9, the EPA doesn’t yet provide a central repository for filing and viewing EISs electronically. Instead, each week they prepare a digest of the preceding week’s filed EISs, which is published every Friday in the Federal Register under the title, “Notice of Availability” (NOA).
We’ve done the dirty work for you. Below, we’ve located and linked to the EISs referenced in last week’s NOA (and the previous week’s here!). Please note that some of these documents can be very large, and may take a while to load.
You can read any available EPA comments on these EISs here.
Starting October 1, 2012, EPA no longer accepts paper copies or CDs of EISs for filing purposes. All submissions on or after October 1, 2012 must be made through e-NEPA. Electronic submission does not change requirements for distribution of EISs for public review and comment. To begin using e-NEPA, you must first register with EPA’s electronic reporting site. An EPA source says that as EISs begin to come in electronically, they will appear alongside EPA comments here.
* * *
EIS No. 20140167, Final EIS, USACE, HI, Honolulu Seawater Air Conditioning Project, Review Period Ends: 07/14/2014, Contact: Ryan Winn 808-835-4309.
EIS No. 20140168, Final EIS, NPS, FL, Fort Matanzas National Monument Final General Management Plan, Review Period Ends: 07/14/2014, Contact: Gordon Wilson 904-829-6506 Ext. 221. Website.
EIS No. 20140169, Final EIS, FHWA, DC, Virginia Avenue Tunnel Reconstruction, Review Period Ends: 07/14/2014, Contact: Michael Hicks 202-219-3513. Website.
EIS No. 20140170, Final EIS, USFS, NM, Gila National Forest Travel Management Rule Implementation, Review Period Ends: 07/28/2014, Contact: Lisa Mizuno 575-388-8267. Website.
Amended Notices
EIS No. 20140164, Final Supplement, FHWA, NCDOT, NC, Monroe Connector/Bypass, Contact: George Hoops 919-747-7022. Revision to the FR Notice Published 06/06/2014; Correction to Contact Phone Number should be 919-747-7022. Under MAP-21 section 1319, FHWA has issued a single FSEIS and ROD. Therefore, the 30-day wait/review period under NEPA does not apply to this action. Website.
And last week’s:
EIS No. 20140162, Final EIS, FAA, TX, SpaceX Texas Launch Site, Review Period Ends: 07/07/2014, Contact: Stacey Zee 202–267–9305. Website.
EIS No. 20140163, Draft EIS (Tiering), NASA, FL, Tier 2—Mars 2020 Mission, Comment Period Ends: 07/21/2014, Contact: George Tahu 202–258–0016. Website.
EIS No. 20140164, Final Supplement, FHWA, NCDOT, NC, Monroe Connector/Bypass, Contact: George Hoops 919–707–6022, Under MAP–21 section 1319, FHWA has issued a single FSEIS and ROD. Therefore, the 30-day wait/review period under NEPA does not apply to this action. Website.
EIS No. 20140165, Draft EIS, USACE, WA, Skagit River Flood Risk Management General Investigation, Comment Period Ends: 07/21/2014, Contact: Hannah Hadley 206–764–6950. Website.
EIS No. 20140166, Draft EIS, USACE, WA, BP Cherry Point Dock, Comment Period Ends: 08/06/2014, Contact: Olivia Romano 206–764–6960. Website.
Amended Notices
EIS No. 20130365, Draft EIS, NMFS, USFWS, BR, CA, Bay Delta Conservation Plan, Comment Period Ends: 07/29/2014, Contact: Ryan Wulff 916–930–3733. Revision to the FR Notice Published 02/21/2014; Extending Comment Period from 06/13/2014 to 07/29/2014; The U.S. Department of the Interior’s Bureau of Reclamation and Fish and Wildlife Service, the U.S. Department of Commerce’s National Marine Fisheries Service are joint lead agencies for the above project. Website and website.